FWDA Documents by Study Area

jump over navigation barAerial photo of Fort Wingate.

Click on area for document list.

FWDA Site-wide Documents
Kickout Are
Military Munition Map
Storage Igloos
Parcel 1
Parcel 2
Parcel 3
Parcel 4A
Parcel 4B
Parcel 5A
Parcel 5B
Parcel 6
Parcel 7
Parcel 8
Parcel 9
Parcel 10A
Parcel 10B
Parcel 11
Parcel 12
Parcel 13
Parcel 14
Parcel 16
Parcel 18
Parcel 19
Parcel 20
Parcel 21
Parcel 22
Parcel 23
Parcel 24
Parcel 25

FWDA Site-wide Documents (Back to top)

Final Groundwater Periodic Monitoring Report, July through December 2022, Nov. 30, 2023

Final Northern Area Groundwater RFI Report, Revision 3, Jun 30, 2023

Final Groundwater Periodic Monitoring Report January Through June 2022, March 13, 2023

* Appendices

Final Revised Work Plan Addendum, Abandon and Plug Artesian Wells #68 and #69, March 3, 2023

Letter Work Plan for the Downhole Inspection for Well BGMW08 per the Approval w/ modifications on the July - December 2020 PMR dated July 25, 2022., Dec. 28, 2022

Final Groundwater Background Evaluation Fort Wingate Depot Activity McKinley County, New Mexico, Dec. 19, 2022

* Appendices

Final Northern Area Groundwater RCRA Facility Investigation, Dec. 19, 2022

* Appendices

Final Groundwater Periodic Monitoring Report July Through December 2021, Sept. 30, 2022.

* Appendices

Final Groundwater Periodic Monitoring Report July Through December 2020, Revision 3, Sept. 30, 2022.

* Appendices

2023 Interim Northern Area Groundwater Monitoring Plan, Revision 1, Aug. 23,2022.

Final Work Plan Abandon and Plug Artesian Wells #68 and #69, June 15, 2022.

* Appendix

Response to New Mexico Environmental Department (NMED), second response to the Approval with Modifications Final Revision 1 Groundwater Periodic Monitoring Report (GWPMR) July – Dec 2018, Apr. 19, 2021.

* Appendices

Final Groundwater Periodic Monitoring Report January through June 2020, Mar. 30, 2021.

* Appendices D_E

Final Groundwater Background Evaluation, Mar. 1, 2021

Second Response, Approval with Modifications, Response to Approval with Modifications,
Final Revision 1 Groundwater Periodic Monitoring Report, July Through December 2018, Feb. 16, 2021

* Revision1_GWPMR_July_Dec_2018_appendices

Final Revision 1 Groundwater Periodic Monitoring Report July through December 2018, April 15, 2020

Final 2019 Interim Northern Area Groundwater Monitoring Plan Version 11, Apr. 1, 2020

Final Groundwater Background Evaluation Report, Dec. 26, 2019

Final GW Background Eval Appendices

Final Parcel 3 Groundwater Background Wells and Replacement Monitoring Wells Installation Work Plan, Dec. 18, 2019

Letter Work Plan, Downgradient Alluvial Aquifer Investigation & Installation of One Additional Well FWDA, Dec. 11, 2019

Final Groundwater Periodic Monitoring Report, July - December 2018, November 30, 2019

Final Revision 1 Groundwater Periodic Monitoring Report, January - June 2018, Oct. 28, 2019

Ground Water Periodic Monitoring Report January Through June 2018, Apr. 5, 2019

Final Revision 1 Groundwater Periodic Monitoring Report, July - December 2017, Feb. 28, 2019

Final 2017 Interim Facility-Wide Groundwater Monitoring Plan, Version 10, Revision 1, July 27, 2018

• Appendices_Final_2017_Interim_FW_GW_Monitoring_Plan_Ver 10_Rev 1.zip

Final Revision 1 Groundwater Periodic Monitoring Report January Through June 2016, Nov. 30, 2017

Final 2017 Interim Facility-Wide Groundwater Monitoring Plan, Oct. 12, 2017

Final Groundwater Periodic Monitoring Report January Through June 2017, Sept 19, 2017

Final Fort Wingate Depot Activity Groundwater Monitoring Northern Area Background Well Installation Letter Work Plan, Sep. 18, 2017

Final Facility Wide Groundwater Periodic Monitoring Report July Through December 2016 Submission Conducted in October 2016 FWDA, Aug. 31, 2017

Appendices Cover.pdf

Appendices A Cover.pdf

Appendix A1-DQSR.pdf

Appendix A2-DVR and QAQC-RPD Tables.pdf

Appendix A3-Total and Dissolved Metals Tables.pdf

Appendix A4-Chain of Custodies.pdf

Appendix A5-EDMS Database/Appendix A5 Cover.pdf

Appendix B Cover.pdf

Appendix C-Field Log Books.pdf

Appendix D-Well Sampling Data Forms.pdf

Appendix E-New Monitoring Well Logs and Well Completion Diagrams.pdf

Appendix F Proposed October 2010 Sampling Plan.pdf

Apr_28_2015_Final Interim Facility-Wide Groundwater Monitoring Plan, Version 8, Revision 1

Jul_01_2015_Final Stormwater Pollution Prevention Plan for Permittee-Initiated Interim Measures Parcels 6, 13, 16, 21, and 22

April_28_2015_Final Interim Facility-Wide Groundwater Monitoring Plan, Version 8, Revision 1

July_1_2015_Final Environmental Protection Plan for Parcels 6, 13, 16, 21, and 22

Mar_27_2015_Final Groundwater Periodic Monitoring Report July through December 2014

Jan_30_2015_Final Groundwater Supplemental RCRA Facility Investigation Work Plan

Mar_18_2015_Final Groundwater Technical Memorandum Background Evaluation Revision 1

Wingate Ordnance Depot 1850-1958

Final Groundwater Periodic Monitoring Report January through June 2014, Sep 26, 2014

Final Technical Memorandum Groundwater Background Evaluation, Sep 5, 2014

'Final - Groundwater Periodic Monitoring Report for July thru December 2013 - Main Text and Appendices A-D, Apr. 22, 2014

RCRA Class 3 Permit Modification, December 1, 2005 (Revised: April 2014), Apr. 7, 2014

Military Munitions Map and Table for 2014 - FWDA, Mar. 7, 2014

Final-2014 Interim Measures Facility-Wide Groundwater Monitoring Plan, Version 7, Jan 13, 2014

Base Realignment & Closure Installation Action Plan, FY2013 - FWDA , Dec. 10. 2013

Final Groundwater Periodic Monitoring Report, January thru June 2013, Main Text and Appendices A-D - FWDA , Sept. 18, 2013

Final - Groundwater Periodic Monitoring Report, July 2012 thru December 2012- FWDA , May 21, 2013

Base Realignment & Closure Installation Action Plan FY 2012 FWDA, Mar 23, 2013

Community Relations Plan Annual MMRP Map Update Figure 11, Figure 12, Table 5, 2012 Activities - FWDA, Mar. 1 2013

Approved Final Phase 2 Soil Background Report - FWDA , Feb. 5, 2013
Approved Jul. 23, 2013

Final Groundwater Periodic Monitoring Report for April 2012, Version 1 - FWDA , Jan. 28, 2013

2011 and 2012 Monitoring Well Installation and Abandonment Report, Version 1 - FWDA, Dec. 28, 2012

Final Interim Facility-Wide Groundwater Monitoring Plan, Version 6 - FWDA, Oct. 15, 2012

Final Groundwater Periodic Monitoring Report for April thru October 2011 - FWDA, 5/14/2012

Community Relations Plan Annual MMRP Map Update, Figure 11, Figure 12, Table 5- 2011 Activities, March 2012 Submittal - FWDA

Risk Assessment Guidance for Site Investigations and Remediation, February 2012, New Mexico Environment Department - Feb. 1, 2012

Phase 2 Soil Background Work Plan - FWDA, Jan 20, 2012

Base Realignment & Closure Installation Action Plan FY 2011 FWDA, Sept, 24, 2011

Final - Groundwater Periodic Monitoring Report for October 2010 through January 2011, Version 1 - FWDA, July 15, 2011

Final - Interim Facility-Wide Groundwater Monitoring Plan, Version 5 - FWDA, July 15, 2011

FWDA RCRA Permit Issued December 1, 2005, Modified June 27, 2011

Monitoring Well Installation and Abandonment Work Plan - FWDA, April 12, 2011

Community Relations Plan Annual MMRP Map Update Figure 11, Figure 12, Table 5 - 2010 Activities - March 2011 - FWDA, Mar. 28. 2011

'HAFB Fact Sheet (RCRA Post Closure Permit), Mar. 10, 2011

Facility-Wide Groundwater Periodic Monitoring Report for October 2009 to January 2010, Version 2 - FWDA, Jan 7, 2011

Facility-Wide Groundwater Periodic Monitoring Report for April 2010 to July 2010 - FWDA, Dec. 20, 2010

Soil Background Study and Data Evaluation Report, Version 2 Final October 13, 2010

Base Realignment & Closure Installation Action Plan FY 2010 - FWDA, Sept. 24, 2010

Community Relations Plan, Annual MMRP Map Update - Figure 11, Figure 12, Table 5 - March 2010 Submittal-FWDA , Mar 4, 2010 

Facility-Wide Groundwater Periodic Monitoring Report for April 2009 to July 2009, - January 2010, Version 1 - FWDA

Work Plan-Background Study & Data Evaluation, Revision 2 - Final, Dec 4, 2009

Installation Action Plan, FY 2009, September 30, 2009

Technical Background Document For Development of Soil Screening Levels Revision 5.0. August 1, 2009

Facility Wide, Groundwater Periodic Report for Oct. 2008 – Jan. 2009 Version 1 - FWDA, USACE Albuquerque District, 06/01/2009

Military Munitions Maps and Table, Feb 2009

Final Work Plan Background Study and Geochemical Evaluation Fort Wingate Depot Activity Gallup, New Mexico. January 2009

'Facility-Wide Groundwater Periodic Monitoring Report for January, April, July 2008, Version 1, RCRA Permit No. 3213820974-FWDA, Dec 1, 2008

'Base Realignment & Closure Installation Action Plan, FY 2008-FWDA, Nov 1, 2008

Final - Report of Investigation for Potential Environmental Areas of Concern - FWDA, Nov. 11, 2007

Final Interim Facility-Wide Ground Water Monitoring Plan Version 1 Fort Wingate Depot Activity,
3 October 2007

Summary Interviews-FWDA, Feb 20, 2007

Installation Action Plan, FY07

New Mexico Environmental Department TPH Screening Guidelines, Oct. 2006.

Aerial Photographic Analysis, Vol. 1 Main Report & Appendix, Sep 1, 2006

Technical Background Document for Development of Soil Screening Levels Revision 4.0, June 2006

FWDA RCRA Permit, Dec. 05

'Identity and Distribute of Residues of Energetic Compounds At Military Live-Fire Training Ranges-FWDA, Nov 1, 2005

'Site Information - FWDA, Aug 30, 2005

Examination of Protocols for the Collection of Munitions-Derived Explosives Residues on Snow Covered Ice, Apr 1, 2005

'Collection Methods & Laboratory Processing Samples from Donnelly Training Area Firing Points, Alaska, 2003, Mar 1, 2005

'Estimating Energetic Residue Loading on Military Artillery Ranges-FWDA, Mar 1, 2005

Site Assessment Report – Final Draft-FWDA, Feb. 1, 1998

Final Remedial Investigation/Feasibility Study and RCRA Correction Action Program Document Vol. 1 thru 10-FWDA, Nov. 1, 1997

Final Environmental Impact Statement, Base Realignment And Closure, Fort Wingate Depot Activity, Navajo Depot Activity, Umatilla Depot Activity, Hawthorne Army Ammunition Plan , Aug. 1, 1991

'Site and Safety Plan, June 1, 1987

Final_Report_Environmental Survey of Fort Wingate Depot Activity-FWDA, Sept.1, 1981

Wingate Ordnance Depot, Facilities Data - FWDA, 05/1/1961

Community Relations Plan

GPMR_Jul-Dec2015_ArmyDraft

AppA

AppB

DQE_ReportFall2015

280-76166-1

280-76166-2

280-76166-3

280-76216-1

280-76216-2

280-76216-3

280-76268-1

280-76268-2

280-76268-3

280-76331-1

280-76331-2

280-76331-3

280-76405-1

280-76405-2

280-76475-1

280-76475-2

280-76532-1

280-76532-2

280-77373-1

280-76048-1

280-76048-2

280-76114-1

280-76114-2

J76216-1 Std_Tal_L4_Package_Mini Rev(2) Final Report

J76216-2 Std_Tal_L4_Package_Mini Final Report

J76216-3 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76268-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76268-2 Std_Tal_L4_Package_Mini Final Report

J76268-3 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76331-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76331-2 Std_Tal_L4_Package_Mini Final Report

J76331-3 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76405-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76405-2 Std_Tal_L4_Package_Mini Final Report

J76475-1 Std_Tal_L4_Package_Mini Final Report

J76475-2 Std_Tal_L4_Package_Mini Final Report

J76532-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76532-2 Std_Tal_L4_Package_Mini Final Report

J77373-1 Std_Tal_L4_Package_Mini Final Report

J76048-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76048-2 Std_Tal_L4_Package_Mini Final Report

J76114-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76114-2 Std_Tal_L4_Package_Mini Final Report

J76166-1 Std_Tal_L4_Package_Mini Rev(1) Final Report

J76166-2 Std_Tal_L4_Package_Mini Final Report

J76166-3 Std_Tal_L4_Package_Mini Rev(1) Final Report

FtWingate_AppendixD_Nov2015_Data

Appendix C2B

Appendix C2C

Appendix C2D

Appendix D SSHP

Appendix F QSM

Appendix G_NMED

Final FWGMP_Vers 8 Main Text

Final FWGMP_Vers 8 Main Text.pdf.accreport

GWMP Rev 8-NMED CRT ltr 4Jan2015[1]

Appendices

Appendix C-1

Appendix C2A

WD-11 Well Plugging Record - Wingate 89

WD-11 Well Plugging Record - Wingate 90

WD-11 Well Plugging Record - Wingate 91

WD-11 Well Plugging Record - FW26

Q91_FIG 11_March_20160317

Q91_FIG_12_March_20160317 (002)

MEC Map submission ltr March 2016

CRP_Table_5_Military_Munitions_Summary_Table_March 2016

Nov_16_2015Army_ Draft_HWMU_ Removal_ Report

Army Draft_HWMU Removal Report_Appendices Only

GPMR_Jan-June2015_Final

AppA

AppB

AppC_DQE_Report

Attach1

J67366-1 Std_Tal_L4_Package_Mini Final Report

J67366-2 Std_Tal_L4_Package_Mini Final Report

J67438-1 Std_Tal_L4_Package_Mini Final Report

J67438-2 Std_Tal_L4_Package_Mini Final Report

J67484-1 Std_Tal_L4_Package_Mini Final Report

J67484-2 Std_Tal_L4_Package_Mini Final Report

J67561-1 Std_Tal_L4_Package_Mini Final Report

J67561-2 Std_Tal_L4_Package_Mini Final Report

J67662-1 Std_Tal_L4_Package_Mini Final Report

J67662-2 Std_Tal_L4_Package_Mini Final Report

J67711-1 Std_Tal_L4_Package_Mini Final Report

J67711-2 Std_Tal_L4_Package_Mini Final Report

J67267-1 Std_Tal_L4_Package_Mini Final Report

J67267-2 Std_Tal_L4_Package_Mini Final Report

J67316-1 Std_Tal_L4_Package_Mini Final Report

J67316-2 Std_Tal_L4_Package_Mini Final Report

EvapNorthTankSedSampling

FtWingate_AppendixE_Apr2015_Data

Oct_20_2015_Sampling_Letter_Contamination_for_HWMU_Removal

Oct_22_2015_Well _340 _Assessment _Report

Oct_22_2015_Well_ 2_ Assessment _Report

Oct_28_2015_FW_ GW_ April _2015_ report

Oct_28_2015_GPMR_Replacement_Page_Submittal-Letter

Oct_30_2009_ Environmental Information Management Plan

Sep_18_2015_404_Permit_Pika_4345_2014dec-Agent signed

Sept_9_2015_Disapproval_Final_ Facility_Wide_GW-Revision 6

Sept_9_2015_Disapproval_Tech_Memorandum_GW-2015

Sept_9_2015_Fee_Assessment_Final_GW_July_Thru_Dec_2014

Sept_16_2015_NMED_GW_Approval_wMods_GWPM_Report

Sept_21_2015_physical_security_inspection_report

2012 Nationwide permits conditions district engineers decision further Info

April_1_1968 Site Study for a Water Wall

BCT meeting and sign in sheet Feb_5_1997

Dec 30 2015 Extension Request for GW Background Evaluation

Dec 30 2015 Extension Request for TNT Leaching Bed Soil Borring Results & Development of site specific DAF

Dec 30 2015 Extention Request 2015 Interim Measures FW GW monitoring plan Rev_8

Dec_10_2015_15th_missile_launch_out of fort wingate

Dec_14_2015_Army_says_patriot_missile_test_a_success_article

Dec_18_2015_Army_draft__Interim_Measures_WP_areas_of_concern_solid_waste_management_units_kickout_area - Shortcut

Dec_22_2015_Extension_request_for_three_documents_FWDA

Dec_22_2015_Revised interim FW GW monitoring plan at fwda

Feb_1_2002_SW_SWPPP

Feb_4_2016_Waste Management Plan & Haradous Waste Contingency Plan

Feb_22_2010 Military Munitions Summary Table

Feb_23_2016_Army_GW_Background_Tech_Memo_Extension_Request (003)

Fee assesments Jan_14_2016

Jan_1_2016_Development of soil screening levels & Site specific DAF

Jan_4_2016 Interim FW GW monitoring plan FWDA

Jan_27_2012 Military Munitions Summary Table

Jan_27_2016_Development of Soil screening levels

Jan_27_2016_FWDA_TNT_leaching_Bed_soil_Boring_Test_results_DAF

Jan_28_2016 Administrative Completeness Deterimination

July_1_1969 Drilling _testing of Well 340

July_1_2015_Risk_Assessment_Guidance for_SI_and_Remediation

July_15_2011 Interim Facility Wide GW Monitoring Plan Version 5

June_1_1997 SWPPP General Storm Water Discharge Permit

June_13_2015 Ordnance Explosives off Post Removal Action Report

Mar_1_2005 Collection Methos & Lab Processing Firing Points

Mar_1_2005_ Estimating Energetic Residue Loading on Military Artillery Ranges

March _1_2016 EMC Inventory of WMM Invironemtnal Remediations Efforts FWDA

March 1 2016 Second extention Requestion for GW Background Eval

March 30 2016 Fee Assessment

March 30 2016Ground water

March_1_1988 Master Plan Report

March_1_1990 Enhanced Preliminary Assessment Report

March_4_2016 Fee Assesment

March_24_2016_Extension Request Revised Final Northern GW RCRA

May_1_1993 UST Bldg 6 Area GW Monitoring Program

May_5_2015_BCT_Meeting FINAL

May_20_15_Revised Letter Work Plan Soil Testing and Removal at the Former Water Tower and Tank Sites at FWDA

MDA_ July 2 1997

Media_2016

Multi parcel 1997

Nov_1_2005_ Identity and distribution of residues of energetic compounds at military live fire training ranges

Nov_6_1992 F Technical plan for the Environmental Investigation

Nov_6_1992 Final Health Plan and Safety Plan for the Environmental Investigation

Nov_7_14_Well_Plugging_Plan_of_Operations_2

Nov_7_2014_Well_Plugging_Plan_of_Operations_1

Nov_18_1996_Site Health and Safety Plan Drilling Services

Oct_1_2015_Final_GW_Supplemental_RCRA_Facility

Oct_1_2015_NMED_Annual_Fee_

Oct_7_2015_Army_PIIM_WP_Extension_Request

Oct_14_2015_Army _Draft_ Interim _Measures_ Work Plan_

Oct_20_2015_final_Sampling_Results_for_Area_Contamination_HWMU_RemovalHistory of Fort Wingate

Wingate Centennial History

The History of Fort Wingate H. James

Kickout Area

Jan_09_2015_Final_Project Management Plan for Parcels 11, 20, and 22

Feb_06_2015_Final Work Plan Munitions and Explosives of Concern Removal and Surface Clearance in the Kickout Area

Feb_26_2015_Final Accident Prevention Plan for KOA MEC Removal and Surface Clearance

Military Munition Map

Military Munitions Maps and Table, CY 2020, Mar. 15, 2021

Military Munitions Maps and Table for 2019, FWDA, Mar. 19, 2020

Storage Igloos

Final Igloo Exterior and Revetment RCRA Facility Investigation Sampling Work Plan

Igloo Storage Inspection and Inventory Annual Report 2023

Earth Covered Magazine (ECM) Inventory of Waste Military Munitions at Ft. Wingate NM, Quarterly Report, Mar. 1, 2021

Final Igloo Storage Inspection and Inventory Annual Report, June 1, 2020

Igloo Storage Inspection and Inventory Reports, June 5, 2019

Earth Covered Magazine (ECM) Inventory of Waste Military Munitions Environmental Remediation Efforts FWDA NM, June 7, 2017'

Repair of Earth Covered Magazines-FWDA, July 1, 2008

'Inspection and Return of D Area Magazines-FWDA, July 1, 2005

Parcel 1 (Back to top)

'Draft - Ballistic Missile Defense Organization Environmental Assessment (Launch Complex), June 1, 1999

FWDA NO FURTHER ACTION PROPOSAL-FORMER MISSILE TEST SITES EPA ID #: NMD002208627, 10/7/98

FORT WINGATE DEPOT ACTIVITY NO FURTHER ACTION PROPOSAL-FORMER MISSILE TEST SITES, 8/4/98

'Specification for Environmental Protection Shelter, HERA Support Program - FWDA, Apr 1, 1996

Final Supplemental Health and Safety Plan – Field Investigation, Preparation of RI/FS Report, and Accelerate Transfer of the SW Property, Igloo Blocks A, B, and C and the Ballistic Missile Site Areas-FWDA , Dec 18, 1992

Parcel 2 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Feb_20_2015_Final RCRA Facility Investigation Work Plan Parcel 2

'Sampling & Analysis Plan for Removal and Disposal of Group C and Central Landfills - FWDA, Dec. 29, 1998

FW95-16, Final Report Fort Wingate Depot Activity, Gallup, New Mexico, Work Plans: Field Sampling Plan and Contaminated Materials Handling Plan, Debris Piles and Burial Sites, Dec. 1995

Oct_20_2015_Extention_WP_Parcels_2_9_19

Oct_29_2015_FWDA_ Parcel_ 2_Extention_Request_RFI_Work_Plan

Aug_24_2015_NMED_P2_Disapproval_RFI_WP

Parcel 3 (Back to top)

HWMU Progress Status Report 2022

Final Parcel 3 Groundwater RCRA Facility Investigation Supplemental Sampling Work Plan, April, 18, 2023

Approved Final Hazardous Waste Management Unit (HWMU) Progress Status Report, 2020 Hazardous Waste Management Unit (HWMU) Parcel 3, Oct. 14, 2021.

Final Hazardous Waste Management Unit (HWMU) Progress Status Report 2020 Parcel 3, Jun. 11, 2021.

Final Revision 1 Hazardous Waste Management Unit Progress Status Report, 2012-2018, HWMU, Parcel 3, Mar. 22, 2021

Approved Final, Revision 1, Parcel 3 Groundwater Background Wells and Replacement Monitoring Wells Installation WP, Mar. 15, 2021

Final Hazardous Waste Management Unit Progress Status Report, 2019, HWMU, Parcel 3, June 23, 2020

Final Hazardous Waste Management Unit Status Report 2012-2018, HWMU, Parcel 3, May 19, 2020

Final Work Plan Inner Fence, Parcel 3, Revision 3.0, Feb. 28, 2020

Final Work Plan, Inner Fence, Parcel 3, Oct. 15, 2019

Final Revision 1 Parcel 3 Groundwater RCRA Facility Investigation Report, Mar. 31, 2019

Final Parcel 3 Groundwater RCRA Facility Investigation Report (Southern Area), June 26, 2018

Final Work Plan Inner Fence Parcel 3, Nov. 29, 2017

Final Corrective Action Management Unit (CAMU) Biennial Soil Sampling Event Letter Report, July 27, 2017

July_23_2015_Deviation Approval and Risk Acceptance Document P3

Spill Prevention, Control, and Countermeasures Plan HWMU, Parcel 3, Nov. 14, 2013

'OB/OD Hazardous Waste Contingency Plan, Rev. 1 - FWDA, Jun. 25, 2013

Final CAMU Sampling Work Plan HWMU, Parcel 3 - Revision 1.0 - FWDA, Apr. 11, 2013

'Approved Final - Removal Work Plan HWMU, Parcel 3 - FWDA, Feb. 19, 2013

Draft - Site Specific Final Report, OB/OD Detonation Unit Kickout Investigation (Appendix B-G) - FWDA, May 1, 2009

Site-Specific Final Report, OB/OD Unit Kickout Investigation Report dated October 2009-FWDA, Mar. 3, 2010

Site-Specific Final Report, Time –Critical Action for the Arroyo Exiting Parcel 3 – DRAFT-FWDA, December 1, 2008

Kickout Investigation Work Plan – Final-FWDA, July 9, 2008

Final Closure Plan Phase I Work Plan OB/OD Unit HWMU and Parcel 3 SWMUs and AOCs Fort Wingate Depot Activity McKinley County, New Mexico. 27 June 2008

Final Summary Report of Historical Information OB/OD Unit HWMU and Parcel 3 SWMUs and AOCs Fort Wingate Depot Activity McKinley County, New Mexico. 27 June 2008

Time Critical Removal Action Addendum to the Final Kickout Investigation Work Plan - FWDA, June 2, 2008

'Final Work Plan, Installation Fencing the Western and Northern Boundary of Parcel 3-FWDA, Apr 1, 2006

'PCB Inventory-FWDA, Jan 1, 2005

'Risk Assessment Technical Memorandum, OB/OD Areas – Final-FWDA, Sept. 15, 2000

Final Open Burning/Open Detonation Area RCRA Interim Status Closure Plan Phase IB - Characterization and Assessment of Site Conditions for the Ground Water Matrix. 29 December 1999

Final Open Burning/Open Detonation Area RCRA Interim Status Closure Plan Phase IA - Characterization and Assessment of Site Conditions for the Soils/Solid Matrix Fort Wingate Depot Activity Gallup, NM. 29 November 1999

'Final Resource Conservation and Recovery Act Interim Status Closure Plan-FWDA, Mar 1, 1993

'Specification for Environmental Protection Shelter, HERA Support Program - FWDA, Apr 1, 1996

'RCRA Part B Permit Application for Open Burning/Open Detonation, Volume 2 - FWDA, Nov 1, 1988 

'RCRA Part B Permit Application for Open Burning/Open Detonation at FWDA, Nov. 1, 1988

Nov_1_2015_Parcel_3_Groundwater_Quality_Control_Plan

Nov_1_2015_Project_Management_Plan_ Parcel _3 _Groundwater _RFI

Oct_12_2015_Draft PMP Parcel 3 Groundwater RFI_

Oct_12_2015_Parcel 3_Groundwater_RCRA_Facility_Investigation_QC_Plan

Oct_12_2015_Parcel_3 _Accident_Prevention_Plan_Groundwater_RCRA

Dec_31_2015_army_draft_P3_GW_rcra_facility_investigation_wp

Nov_1_2015_Parcel_ 3_Accident_Pervention_Plan_GW_RCRA_Facility

FWDA_Army Draft_HWMU Removal Report - Appendices K - N

FWDA_Army Draft_HWMU Removal Report - Appendix J

FWDA_Army Draft_HWMU Removal Report - Text Only

FWDA_Army Draft_HWMU Removal Report - Appendices A - D

FWDA_Army Draft_HWMU Removal Report - Appendices E - I

Final DRAFT Parcel 3 RFI WP 102315 Text Only

Final DRAFT Parcel 3 RFI WP 102315_WP_only_no_appendices

Final DRAFT Parcel 3 RFI QAPP 102315 Text Only

F_SRHI_OBOD_P3_Appendix B

F_SRHI_OBOD_P3_Appendix C

F_SRHI_OBOD_P3_Appendix D

F_SRHI_OBOD_P3_Appendix E

F_SRHI_OBOD_P3_Appendix F

F_SRHI_OBOD_P3_Appendix G

F_OBOD_CP_IA_SOIL

F_OBOD_CP_IB_GW Appendix F for Appendix A

F_SRHI_OBOD_P3

F_SRHI_OBOD_P3_Appendix A

Appendix C - CO_20131218_BLASE_BRAC_NMED

Parcel_3 Historical Analytical Results

Final DRAFT Appendix D - Parcel 3 RFI QAPP

FWDA Parcel 3 SWMUs and AOCs RFI Schedule

Ft Wingate Draft RTC

Parcel 4A (Back to top)

Final - Permittee-Initiated Interim Measures Report for Parcel 4A, Area of Concern 29 - FWDA , Apr. 15, 2014

Final Release Assessment Report Parcel 4A, Revision 2.0 - FWDA, Oct. 11, 2012

Parcel 4B (Back to top)

Parcel 5A (Back to top)

Parcel 5B (Back to top)

Parcel 6 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Final RCRA Facility Investigation Report Parcel 6, Revision 1.0, Mar. 29, 2019

Final Permittee-Initiated Interim Measures Report Parcel 6 Revision 1.0, Jul 27, 2018

May_04_2015_Final-Permittee Initiated Interim Measures Work Plan Parcel 6 Revision 1.0

Final RCRA Facility Investigation Report Parcel 6, Main Text & Appendices - FWDA, Sept. 30, 2012

Final - NMED Revised RCRA Facility Investigation Work Plan for Parcel 6 - FWDA, Mar. 30, 2011

Final Historical Information Report Parcel 6 Fort Wingate Depot Activity McKinley County, New Mexico. 23 February 2009

'Closed Transfering & Transfered Range & Site Inventory Report-FWDA - Final, June 1, 2003

'Environmental Condition of Property, Parcel 6 & 22 - FWDA, Jan 1, 2003

'Work Plan Environmental Characterization, Buildings 542 and 600 - Final-FWDA, Nov 15, 2000

'MOA Environmental Team - FWDA, Aug. 24, 2000

Parcel_6_2016

Parcel 7 (Back to top)

Final RCRA Facility Investigation Report Parcel 7 Revision - Main Text, June 27, 2018

Final RCRA Facility Investigation Report Parcel 7 Revision - Appendices, June 27, 2018

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Final RCRA Facility Investigation Work Plan and HISD, Parcel 7 - FWDA, Jan. 3, 2013

'Final Report Western Landfill, Vol I & II-FWDA, July 1, 2005

FW95-16, Final Report Fort Wingate Depot Activity, Gallup, New Mexico, Work Plans: Field Sampling Plan and Contaminated Materials Handling Plan, Debris Piles and Burial Sites, Dec. 1995

Parcel 8 (Back to top)

Parcel 9 (Back to top)

Final Investigation Report Igloo Block A Parcel 9, Jul 1, 2018

Final Parcel 9 Igloo Block A Investigation Report_FWDA Submission Cover Ltr. 27 July 2018

Final Parcel 9 Igloo Block A Investigation Report_FWDA_27 July 2018

Final Summary Report of Historical Information Parcel 9, Jun 8, 2018

Feb_27_2015_Final RCRA Facility Investigation Work Plan Parcel 9

Oct_29_2015_Extention_Request_Parcel_9_RFI_WP

Parcel 10A (Back to top)

Parcel 10B (Back to top)

'Final Report - Garage Pile Analyses Sampling Report for Parcel 10 - FWDA, Dec. 19, 2012

Approved Final - RCRA Facility Investigation Report, Parcel 10B-FWDA, Mar 19, 2012, Approved Feb. 17, 2014

RCRA Facility Investigation Work Plan for Parcel 10B, Vol. One - Main Report, Appendix A, Version 2.0 - FWDA, June 2010

FINAL of the Release Assessment Report for Parcel 10 Volume 1-Main Report, Appendices A-E, Version 3.0-FWDA, Oct 1, 2009

Parcel 11 (Back to top)

Final RCRA Facility Investigation Phase 2 Work Plan Parcel 11 Revision 1.0, Jul 20, 2018

May_26_2016_F_RCRA_Facility Investigation WP_for MEC and EOC P11_SWMU_40 & SWMU_10/May_26_2016_Parcel 11 Final Revised Phase 2 WP.pdf

Apr_22_2015_Final Work Plan for Parcel 11 SWMU 10 and 40

Final - RCRA Facility Investigation Report Parcel 11, Revision 2, Volume 1,2,3 - FWDA , May 23, 2014

Summary Report of Historical Information, Parcel 11-FWDA, June 19, 2009

RCRA Facility Investigation Work Plan, Parcel 11, Revision – Final-FWDA, Jun. 19, 2009

Release Assessment Report Parcels 11, 12, 14, and 25 – DRAFT-FWDA, August 28, 2007

Supplemental Ground Water Investigation, Administration and TNT Leaching Beds Area - FWDA, Mar. 24, 2006

Groundwater Investigation Report Eastern Landfill – Final-FWDA, Apr. 1, 2005

' Field Investigation Report, Building 11-FWDA, Jan 22, 2004

Final FWDA, NM Building 11 PCB Investigation Report, Mar. 1999

FW95-13, Second Quarterly Report on Ground Water Monitoring at UST Bldg 6 Area, Fort Wingate Depot Activity, New Mexico, Dec. 1995

FW95-10, First Quarterly Report on Groundwater Monitoring at UST Building 6 Area Fort Wingate Depot Activity, New Mexico, Nov. 1995

FW95-7, Fort Wingate Depot Activity, Gallup New Mexico, Work Plan for Groundwater Monitoring Program at Ust Bldg. 6 Area, June 1995

FW95-4, State of New Mexico Environmental Department, Review of On-Site Investigation at the Fort Wingate Depot Activity Administration Area, Gallup, New Mexico, (Ground Water Monitoring Requirement Letter, Building 6 UST Area), Apr, 1995

'Geohydrologic Study No. 38-26-8916-90 Storage Yard West of Administration Area-FWDA, Apr 1, 1990

FW90-2, Fort Wingate Depot Activity, Gallup, New Mexico, Geohydrologic Study No. 38-26-8916-90, (Re: Storage Yard West of Administration Area), Apr. 1990

FW80-9, Fort Wingate DA, Gallup, New Mexico, Investigation and Evaluation of Underground Storage Tanks, Sept. 1989

FW71-2, Drilling and Testing of Well 69, Fort Wingate Army Depot, McKinley County, New Mexico Open File Report, Nov. 1971

Jan_7_2016_tribal_review_of_Final_P11_phase_2_RCRA_facility_investigation_fwda

Oct_22_2015_Amec_ Parcel_ 11_ WP _submission_cover_letter

Oct_29_2015_Final_P11_Phase_2_RFI_WP

Jan 7 2016 Disapproval Final WP P11 SWMU 10 & 40 FWDA

Parcel 12 (Back to top)

Approved Final Release Assessment Report for Parcel 12 & 14, Jan 13, 2011

Final Release Assessment Report Parcels 12 & 14, NMED Revision - FWDA, Nov. 16, 2010

Approved Final RCRA Facility Investigaton Work Plan, Parcels 12,14, and 25, Fort Wingte Depot Activity. McKinley County, New Mexico 27 June 2008

Final of the Release Assessment Report for Parcel 12 and Parcel 14, April 2010. Apr. 10, 2010

Release Assessment Report Parcels 11, 12, 14, and 25 – DRAFT-FWDA, August 28, 2007

'Environmental Condition of Property, Parcel 6 & 22 - FWDA, Jan 1, 2003

Parcel 13 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Final RCRA Facility Investigation Report Parcel 13, Aug. 3, 2018

Final RCRA Facility Investigation Work Plan, Parcel 13 - FWDA, 5/10/2012

June_3_2015_USEPA_Approval_ Email_P13_Water_Tower_Soil_Removal_Work_Plan

Appendix B_Analytical Laboratory Report Summaries.pdf

Appendix C_Waste Characterization Results and Disposal Documentation.pdf

P13_Final_RemovalRpt_100516.pdf

Parcel 14 (Back to top)

Approved Final Release Assessment Report for Parcel 12 & 14, Jan 13, 2011

Final Release Assessment Report Parcels 12 & 14, NMED Revision - FWDA, Nov. 16, 2010

Approved Final RCRA Facility Investigaton Work Plan, Parcels 12,14, and 25, Fort Wingte Depot Activity. McKinley County, New Mexico 27 June 2008

Release Assessment Report Parcels 11, 12, 14, and 25 – DRAFT-FWDA, August 28, 2007

Parcel 16 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Final Permittee- Initiated Interim Measures Report Parcel 16 Revision 1.0, Dec. 22, 2017

May_06_2015_Final Permittee-Initated Interim Measures Work Plan for Parcel 16, Revision 1.0

Final RCRA Facility Investigation Report Parcel 16, Main Text and Appendices, May 9, 2014

Final RCRA Facility Investigation Work Plan, Parcel 16 - FWDA, Oct. 1, 2012

Final RCRA Facility Investigation Summary Report of Historical Information Parcel 16 - FWDA, Jan. 10, 2011

Feb_17_2016 Extention Request P16 PIIM Completion

Parcel 18 (Back to top)

Final Investigation and Remediation Completion Report for Parcel 18 Eastern Landfill, Dec 12, 2014

Final Investigation and Remediation Work Plan Parcel 18, Eastern Landfill, Revision 1 - FWDA, Feb. 6, 2013

Draft Final Work Plans Groundwater Investigation Eastern Landfill: 1.Sampling and Analysis Plan; 2. Site Safety and Health Plan-FWDA, Jan 1, 2004

Dec_15_2015_Parcel_18_Petition_Letter

Parcel 19 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Feb_13_2015_Final RCRA Facility Investigation Work Plan Parcel 19

'Inspection and Return of D Area Magazines-FWDA, July 1, 2005

Oct_29_2015_Parcel_ 19_Extention_Request_RFI_WP

Parcel 20 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

March_9_2016 Disapproval Final RCRA Facility Investigation WP P20

Parcel 21 (Back to top)

Response to Approval with Modifications, Final Interim Measures Completion Report, Parcel 21 - Solid Waste Management Unit 1 - TNT Leaching Beds - Revised Report and RLSO

Final Revision 2, Interim Measures Completion Report Parcel 21 SWMU 1 TNT Leaching Beds, Sept. 30, 2022.

* Appendices

Final Interim Measures Completion Report Parcel 21 - Solid Waste Management Unit 1 - TNT Leaching Beds, Dec. 19, 2019

IMCR_P21_SWMU1_appendices

Approved Final Revision 2 Interim Measures Work Plan Parcel 21 SWMU 1- TNT Leaching Beds, Sept. 29, 2017

Feb_13_2015_Final Storm Water Pollution Prevention Plan for Parcel 21<

'Approved Final RCRA Facility Investigation Phase 2 Work Plan, Parcel 21 - FWDA, Aug. 30, 2012, Approved Jun. 20, 2013

RCRA Facility Investigation Report, Parcel 21, Approved Final - FWDA, 8/27/2012

Addendum to the RCRA Facility Investigation Report, Parcel 21 - FWDA, April 24, 2012

'Data Validation Report for Building 522, Sampling Collected on July 12, 2010 - FWDA , Jan 1, 2011

'Data Validation Report for Building B530, Sampling Collected on September 16, 2010 - FWDA, Feb 1, 2010

RCRA Facility Investigation Work Plan Parcel 21 Final Fort Wingate Depot Activity McKinley County, New Mexico Revision - 30 September 2008

Summary Report of Historical Information Parcel 21 Fort Wingate Depot Activity, 7 February 2008

Appendix A-Historical Standard Operatinf Procedures from Summary Report of Historical Information Parcel 21 Fort Wingate Depot Activity, 7 February 2008

Release Assessment Report Parcel 21 Fort Wingate Depot Activity, 7 February 2008

'Draft Final RCRA Facility Investigation Report, TNT Leaching Beds - FWDA, Nov 26, 2001

May_1_1981_FW80-2 Army Pollution Abatement Program Study, Hazardous Waste Management Consultation, Fort Wingate Depot Activity, Gallup, New Mexico (Re: Groundwater Monitoring Requirements at the TNT Wastewater Leaching Beds), May Draft_EPP_FWDA_Parcel21_24_Rev1

81

Draft_EPP_FWDA_Parcel21_24_Rev1

Cover_Ltr_to_Draftl_EPP_SPCC_WMP_HWCP

IMWP_FWDA_Parcel21_Appendix_D_Only

2016 03-11 Draft IMWP Transmittal Letter

Draft_IMWP_FWDA_Parcel21_Rev1

FinalR1_P21_PIIM_WkPlan_102815

Sep_18_2015_Extension_Request_for_Permittee_Initiated_Interim_Measures_WP_Parcel_21

Oct_22_2015_Amec_ Parcel_ 21_ WP_ Rev_ 1_ submission_ cover_ letter

Parcel 22 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

May_5_2016 Final Phase 2 RCRA WP for Munitions and EOC P 22 SWMU and AOCs

Feb_24_2015_Final Permittee-Initiated Interim Measures Work Plan for Parcel 22

May_31_2015_Final RCRA Facility Investigation for Parcel 22, Revision 2.0

Final-RCRA Facility Investigation Report, Parcel 22, Main Text & Appendices- FWDA, 12/9/2011

Final RCRA Facility Investigation Work Plan Parcel 22 Revision September18, 2009

Summary Report of Historical Information, Parcel 22 – UPDATED Final-FWDA, Jun 9, 2008

Release Assessment Report, Parcel 22 – Final-FWDA, Jun. 9, 2008

'Inspection and Return of D Area Magazines-FWDA, July 1, 2005

'Environmental Condition of Property, Parcel 6 & 22 - FWDA, Jan 1, 2003

FW94-2 FWDA Resource Conservation and Recovery Act Modification to Final Interim Status Closure Plan, May 1994

Jan_7_2016_extention_request_revised_P22_wp_fwda

Nov_24_2015_Disapproval_F_WP_P22_Solid_Waste_Management_Units_12_27_70

Jan 12 2016 Second extension Request for P22 Revised PIIM WP FWDA

Parcel 23 (Back to top)

Final Asbestos Survey Report Parcel 2, 6, 7, 13, 16, 19, 20, 22, & 23 - FWDA, Feb. 7, 2020

Asbestos survey report submittal letters

Final RCRA Facility Investigation Phase 2 Work Plan Parcel 23 Revision 1.0 Fort Wingate Depot Activity, McKinley County, New Mexico, Apr. 29, 2019

Final RCRA Facility Investigation Phase 2 Work Plan Parcel 23, Jul 24, 2018

Final RCRA Facility Investigation Parcel 23, Main Text & Appendices, Version 1.0 - FWDA, 4/30/12

Final- NMED Revision RCRA Facility Investigation Work Plan Parcel 23, April 6, 2010

Final Historical Information Report Parcel 23, April 27, 2009

FW95-16, Final Report Fort Wingate Depot Activity, Gallup, New Mexico, Work Plans: Field Sampling Plan and Contaminated Materials Handling Plan, Debris Piles and Burial Sites, Dec. 1995

Nov_17_2015_Parcel _23 _Extension_ Request_Revised_Phase_2

Oct_20_2015_RCRA facility Investigation Phase 2 WP P23

Dec 22 2015 Extension Request P23 Revised Phase II RCRA Facility Investigation WP

Jan 7 2016 Extention Request for Revised P23 Phase II RFI WP FWDA

Jan 19 2016 2nd extention request for the P23 Phase II RCRA Facility Investigation WP

Parcel 24 (Back to top)

Final Rev. 2 Permittee-Initiated Interim Measures Report, Parcel 24 - Igloo Block A, Sept. 27, 2019

Final Rev. 1 Permittee-Initiated Interim Measures Report Parcel 24 Igloo Block A, May 29, 2019

Final Permittee - Initiated Interim Measures for Parcel 24 Igloo Block A, Oct 22, 2014

Feb_4_2016 Accident Prevention Plan Parcels 21_24

Final Release Assessment Report Parcel 24, Jan 31, 2014

Parcel 25 (Back to top)

Parcel 25 Above Ground Storage Tank Site Report. 12/04/2008

Approved Final RCRA Facility Investigaton Work Plan, Parcels 12,14, and 25, Fort Wingte Depot Activity. McKinley County, New Mexico 27 June 2008

Draft Release Assessment Report Parcels 11, 12, 14 and 25 Fort Wingate Depot Activity.
28 August 2007


Parcel 25 DTS Assignment

Nov_20_2015Parcel 25 DTS assignment

 

Return to Documents Page